$100 Website Offer

Get your personal website + domain for just $100.

Limited Time Offer!

Claim Your Website Now

A DisasterRecoveryOps Audit for Your CMS-Powered Website

Imagine a freelance web developer, a made-up composite rather than a real person, who gets the phone call every site owner dreads. A client’s online shop, rebuilt only two months earlier, is showing a blank page on the first morning of a big sale. The developer has backups. The client has a hosting plan. Nobody, it turns out, has a plan for the hour that follows. That hour is what DisasterRecoveryOps is about, and the audit below is how to find out whether your own CMS-driven site would survive its version of that morning.

Work through the checklist with a coffee and a spreadsheet. Every question has a plain answer, and every “we do not know” is an item for the to-do list.

Part one: what would hurt, and how fast

  • List the pages and functions that earn money or trust. Checkout, contact forms, booking, login. If the blog goes dark for a day, nobody weeps; if checkout does, the owner does.
  • Attach a maximum outage to each. Choose numbers such as “checkout: one hour” or “blog: three days”. The Ops Atlas calls this the recovery time objective and says it must be agreed by the person who bears the loss.
  • Decide how much recent content you can afford to lose. For a brochure site, a day of edits may be fine. For orders, every minute counts, which means the database needs fresher copies than the files do.

If you only have time for one thing today, do this part. Pin the list of money-making functions above your desk, because every later decision (what to restore first, what to pay for, what can wait until Monday) flows from it. Owners who skip the ranking end up treating the contact form and the product catalogue as equally urgent, which means neither gets the attention it needs when time is short.

Part two: where the copies live

  • Is there a copy outside your hosting account? The story of one large European data centre fire in 2021 is a reminder, recorded in the Atlas, that backups stored beside the servers can vanish together.
  • Do you keep older versions, not just the latest? If a plugin update corrupts your content, an always-fresh mirror simply copies the damage. You need a few earlier points in time to roll back to.
  • Can you restore into a clean environment? Try it on a throwaway server and time how long it takes. The first attempt is usually humbling.

Part three: who decides, and by when

Back to our imagined developer. In the story, the technical fix takes about half an hour once she begins. The real delay comes earlier: forty minutes of messages between her, the client and the host, trying to work out whether this is a short blip or something bigger. Nobody holds the job of saying “we are moving to the backup site.”

The Atlas makes the point firmly that the clock includes that deliberation. Its worked example has a drill where noticing and deciding took thirty-one minutes and the technical move thirty-three, putting a sixty-minute goal out of reach. Its remedy is a published latest-start time. Take your target, deduct the slowest recent technical restore plus a small cushion, and put the remainder in the runbook where everyone can see it.

  • Name the person who may call a failover, plus a deputy.
  • Write the latest-start time on the first page of the plan.
  • Agree who tells customers, and where, because the site itself may be down.

Part four: the content team’s place in all this

Recovery is not purely an engineering matter. Editors need to know what happens to unpublished drafts and which media files live where, and marketing needs a holding message ready. Think about how each page supports your credibility: our walkthrough of turning visitors into clients with strong service pages argues those pages are the shop window, and a recovery plan should say which of them must return first. Likewise, the case made in why an About Us page builds trust suggests a trimmed-down static version is a sensible fallback while the full CMS is being restored.

  • Keep a minimal static holding page ready that can be served from somewhere independent of the main host.
  • Document where DNS is managed and who holds the login, since traffic steering often needs it.
  • Store emergency credentials outside the platform that might fail. The Atlas notes that a large 2025 cloud outage disrupted sign-in services for some customers, so a login that depends on the damaged provider can lock you out.

Part five: the trip back

Most owners stop planning at the moment the temporary site goes live. That feels like victory, but it is only the halfway mark, and the second half is where subtle mistakes creep in.

After a failover, the temptation is to relax. The Atlas treats the return as a second migration. Orders placed on the temporary site must be copied back, redirects removed, caches cleared and search engines reassured. Add a short section to your plan describing how you will preserve the temporary site’s data before overwriting anything.

Part six: rehearse it

Paper plans fail in quiet, predictable ways: a password that expired, a file path that changed, a person who left the company. Only a timed attempt shows them. Treat the first drill as a discovery session rather than an exam, and bring the editor, the developer and whoever pays the invoice.

Put a date in the diary. Pretend the production site is gone, start the stopwatch, and follow your own document. Record when the problem was noticed, when the decision was made and when the replacement was serving pages. Compare with the targets from part one. According to the Atlas, the maturity steps in the middle concern plans that pass a check and have been exercised, while the higher steps require two consecutive drills finishing inside the target.

Small agencies will rarely climb to the top, and they do not need to. Reaching “we have rehearsed it once and fixed what went wrong” already puts you ahead of most. If you want the long-form reference behind these ideas, the entry for DisasterRecoveryOps in the xOps School Atlas goes deeper than a checklist can.

The scorecard

Give yourself one point for each part where every question has a written answer. Two points or fewer: set a date this month. Four or more: schedule a drill. Our imagined client would have scored zero before that morning, and a bad morning is a persuasive teacher. You can learn the same lessons without ever seeing the blank page, and the cost is a few quiet afternoons.

Related Posts

The Redesign That Finally Shipped: A Team’s One-Page Brief

A fictional story about a small web team stuck in endless revisions, and how a single-page project summary turned a stalled redesign into a launch.

Read More

AIOps for CMS and Marketing Teams: Ten Questions Answered

Ten practical questions web teams ask about AIOps, from plugin-update outages to holiday traffic dips, answered with evidence and CMS-flavoured examples.

Read More

A Beginner’s Weekly Review for Your CMS Website, With Glossary

Learn how to check, clear and plan your website each week: updates, drafts, forms and priorities, plus a short glossary of the terms beginners meet.

Read More

FinOps for CMS Teams: An Eight-Step Starter Walkthrough

An eight-step walkthrough for web and CMS teams: list paid services, assign owners, split shared costs, pick a unit measure and set a simple review rhythm.

Read More

PeopleOps Audit Checklist for Web Teams and CMS Accounts

A precise, tick-box PeopleOps audit for web and content teams: joiners, movers and leavers mapped to CMS roles, shared logins, and the checks that catch orphan accounts.

Read More

Three Ways to Run a CMS Go-Live Checklist, Compared

Memory, a written card or automated gates: how each approach to a CMS go-live checklist feels in practice and which team it suits.

Read More
Subscribe
Notify of
guest
0 Comments
Oldest
Newest Most Voted
0
Would love your thoughts, please comment.x
()
x